Standardized S355JOW Corten Steel Plate

FOB Reference Price:Get Latest Price
$620.00 - $760.00 / Ton | 1 Ton/Tons (Min. Order)
Thickness:
2-100mm
Shipping:
Support Sea freight
Lead Time:
Quantity(Tons) 1 - 6000 >6000
Est. Time(days) 30 Negotiable
Customization:
Customized logo (Min. Order: 1 Tons)
Customized packaging (Min. Order: 1 Tons)

More

Graphic customization (Min. Order: 1 Tons) Less
Report Suspicious Activity
Overview
Quick Details
Standard:
EN
Grade:
S355JOW Corten Steel Plate
Place of Origin:
Henan, China
Brand Name:
WISCO, Baosteel, Angang,etc
Model Number:
S355JOW
Type:
Steel Plate
Technique:
Hot Rolled
Surface Treatment:
Rusted or as Customers' Request
Application:
Mechanical Equipment,Bridges,Decoration,Steel Structure,
Special Use:
Weather Resistance, Anty-corrosion
Width:
1500mm-3200mm
Length:
6000mm-15000mm
Product Name:
Standardized S355JOW Corten Steel Plate
Material:
S355JOW
Keyword:
Steel Plate
MOQ:
1 Ton
Packing:
Standard Sea-worthy Packing
Surface:
Rusted,Coated or as Customers' Request
Use:
Mechanical Equipment,Steel Structure,Construction Industry
Package:
Sea-worth Package
Supply Ability
Supply Ability:
6000 Ton/Tons per Month
Packaging & Delivery
Packaging Details
Standard Sea-Worthy Packing
As the request of customers.
Port
Shanghai,Tian jin, Qingdao or as required
Lead Time :
Quantity(Tons) 1 - 6000 >6000
Est. Time(days) 30 To be negotiated
Video Description
Product Description

S355JOW Corten Steel Plate  adapted to the electric power tower, all kinds of lifting crane,bridges,Garden building,Decoration, heavy duty truck, oil derrick,high temperature fan, large power shovel, dump truck, and drilling machine, hydraulic support in coal mine, steel structure, etc.

Product Name
Standardized S355JOW Corten Steel Plate
Material
S355JOW
Standard
AISI, ASTM, BS, DIN, GB, JIS
Technique
Hot rolled
Surface Treatment
Coated, Rusted or as Customers' Request
Package
Outer Packing:
Export Standard Packing Method(Waterproof packing, Bundle with steel strip, Steel pallet), Shipped with 20' or 40' container or in bulk carrier.
As Customers' Request.
Port
Shanghai,Tian jin, Qingdao or as required
Date of delivery
15-30 days after deposit received or L/C received in our bank
            Type
                    C    
                    Si
                    Mn                    
S355JOW
0.12-0.21
 0.20-2.10
 0.70-2.00
                    P
                    S      
                    Cr
                    Cu
≤0.034
 ≤0.036
-
0.10-0.40
             Type
Thickness
Yield Strength
Tensile Strength(Mpa)
Elongation%
S355JOW
2-100mm
355
470-680
 20
                                                                     Part  Of  Steel  Plate  Grades
SA588
S235J0W
A588 Gr.B
-
SA588 Gr.A
A588
A242
-
SA588 Gr.B
A588 Gr.A
S355J2WP
S355K2G1W
Project Case

Standardized S355JOW Corten Steel Plate

As science and technology and cultural creativity, metal and glass are applied because of its concise modern form in concise modern ideas, and weather resistance of steel corrosion materials soon naturally endowed with science and technology, culture, art, ideas, from the design of the rich in culture gradually extended used in some fashion creative office environment.
Our Customer
Our Company&Partner

HENAN ZHERUI STEEL TRADING CO., LTD. is a large steel trading company, which joins steel procurement, sales, deep process, import and export trade as a whole. It is located in one of the seven ancient capitals of China, Anyang city, which is full of abundant resources in Henan province. Since establishment, the company always insists on providing customers with steel products of top quality, superior performance and high cost performance, basing on the service concept of integrity, professionalism, innovation and win-win.

Our Service
Packing & Delivery
FAQ

Q: Where is your company ?
Our company's processing center is located in Anyang city,Henan province, China.

Q: How do you control quality ?
Mill Test Certification is supplied with shipment, Third Party Inspection is available.

Q: How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.

Q: Can you arrange the shipment ?
Sure we can help you with the shipment.

Q:What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.